SAFIRE/A homepage

SAFIRE/A ready to test (1)

SAFIRE/A ready to test (2)

The baroclimatic chamber hangar

Electrical connections

CODM installed

LN2 cooled source (1)

LN2 cooled source (2)

Instrument roll-in in chamber (1)

Instrument roll-in in chamber (2)

Connecting LN2 feedthrough (1)

Connecting LN2 feedthrough (2)

SAFIRE/A installed in chamber

Closing baroclimatic chamber

The baroclimatic chamber is ready