SAFIRE/A ready to test (1)
SAFIRE/A ready to test (2)
The baroclimatic chamber hangar
Electrical connections
CODM installed
LN2 cooled source (1)
LN2 cooled source (2)
Instrument roll-in in chamber (1)
Instrument roll-in in chamber (2)
Connecting LN2 feedthrough (1)
Connecting LN2 feedthrough (2)
SAFIRE/A installed in chamber
Closing baroclimatic chamber
The baroclimatic chamber is ready